Revision 3
The revision below is our third version of the floor plan for our gymnasium. It contains the following features:
- The kitchen has been moved so that it connects to the lobby.
- A hallway has been added to the bathrooms to increase privacy.
- The wall between the electrical room and outside storage has been removed to increase functionality.
- A stage area has been added to the south end of the building as a bump out.
- A beverage station has been added to the lobby adjacent to the kitchen.

